Follow Panalpina

Press Releases 1 hit

Multimodal heavy-lift moves: Panalpina offers hassle-free carrier solution

Multimodal heavy-lift moves: Panalpina offers hassle-free carrier solution

Press Releases   •   Aug 24, 2017 14:00 GMT

Panalpina has launched Panprojects Carrier. With the new carrier model Panalpina can oversee multimodal heavy-lift moves from fabrication to installation sites under one single contract that clearly governs all modes of transport. The legal framework reduces to an absolute minimum the commercial, technical and contractual risks that are inherent to the multimodal transport of project cargo.

News 1 hit

Beaming Bruno

Beaming Bruno

News   •   Jul 25, 2016 08:30 GMT

Bruno is pretty upbeat these days. A few weeks ago, he reached an agreement with Belgium-based medical device company IBA. Panalpina will soon be offering comprehensive value-added warehousing and global transportation services to IBA from its hub at Brussels Airport. For this purpose, a new 2,800 m2 facility is being built. Construction is about to begin.

Blog posts 3 hits

Trouble in Happy Valley-Goose Bay

Trouble in Happy Valley-Goose Bay

Blog posts   •   Dec 22, 2016 11:00 GMT

With the 76 ton subsea tree successfully loaded and secured in the hold beneath him, loadmaster Yrii Rudko’s job was done for now. Sitting in the cabin at the back of the An-124, seat belt fastened, he could feel how 400 tons of mighty flying equipment and cargo accelerated down runway 34 at Senai International Airport in Malaysia. This is part III of Panalpina's "Christmas tree" story.

“This is the kind of mission where transport engineers can excel”

“This is the kind of mission where transport engineers can excel”

Blog posts   •   Dec 21, 2016 07:00 GMT

It was a move to remember for life. Willi Tobler, Panalpina’s global head of transport engineering for Energy and Project Solutions talks in more detail about the challenges he and his team faced when a 76 ton subsea tree for an oil and gas customer had to be loaded onto an Antonov-124 in Malaysia. The tree’s final destination was on the seabed of a gas field located off the coast of Trinidad.

“Difficult, but still possible”

“Difficult, but still possible”

Blog posts   •   Dec 20, 2016 07:00 GMT

On the fourth loading attempt everything finally came into place and gone were the worry lines in the faces of everyone involved: The Christmas tree for the Caribbean was correctly positioned inside the aircraft. It had been inched past the most critical section right under the cockpit of the An-124, where the maximum vertical clearance is 4400 mm. Every single one of these millimeters was needed.

Images View all 10 hits

Subsea tree secured by main frame and upper frame

Subsea tree secured by ma...

License © All rights reserved (allow download)
Photographer / Source Panalpina
Download
Size

206 KB • 2095 x 1411 px

Mission completed: Happy transport engineers

Mission completed: Happy ...

Left: Edward Wong; Right: Willi Tobler

License © All rights reserved (allow download)
Photographer / Source Panalpina
Download
Size

675 KB • 1502 x 1126 px

Custom-built: steel main frame for air transport

Custom-built: steel main ...

License © All rights reserved (allow download)
Photographer / Source Panalpina
Download
Size

174 KB • 2094 x 1323 px

Subsea tree secured by main frame and upper frame

Subsea tree secured by ma...

License © All rights reserved (allow download)
Photographer / Source Panalpina
Download
Size

1.39 MB • 1912 x 1275 px